It was established in the construction personnel camp to treat the domestic wastewater of 5000 people. The system, which purifies approximately 1200 m3/day of wastewater, is designed as a biological treatment system. Since flow rate and organic pollution are important parameters in biological treatment systems, the treatment system was installed and operated in packages according to the population of the camp. The treated wastewater was discharged according to BP standards.